Powering Jamaica since 1982Call: 876-984-2559
Spanish Town, St. CatherineEmergency generator support

Engineering-led solutions

A complete power-security system, designed around your site.

Explore generator supply, sizing, installation, commissioning, maintenance, emergency repairs, transfer systems, switchgear, controls and fuel infrastructure.

01 · Generator sales and sizing

Select equipment for the actual operating requirement.

Lestronics can help define the generator range and configuration using the connected load, motor-starting demand, phase, voltage, frequency, fuel preference, enclosure, duty and site conditions.

  • Residential, commercial and industrial applications
  • Standby or prime-power planning
  • Open or enclosed configurations
  • Single-phase or three-phase requirements
  • Preliminary load review and professional site assessment
Industrial generator equipment
Electrical power equipment

02 · Generator installation

Coordinate the generator with the building and electrical system.

A generator installation may involve location planning, ventilation, exhaust, fuel, cabling, protection, transfer equipment, controls and testing. The final scope is developed after a site review.

  • Site and access review
  • Electrical integration
  • Transfer-switch coordination
  • Fuel and exhaust considerations
  • Testing and handover planning
Discuss an installation

03 · Commissioning

Verify operation before the system is placed into service.

Commissioning confirms that the generating set, controls, transfer sequence and connected systems operate as intended under the agreed test conditions.

  • Pre-start visual and installation checks
  • Control and alarm verification
  • Automatic transfer sequence checks
  • Operational testing and documentation
  • Customer handover orientation
Request commissioning support
Generator control panel
Generator maintenance filters

04 · Preventive maintenance

Find problems before they become unplanned outages.

Routine inspection, testing and servicing can help reveal wear, leaks, battery issues, control faults and consumable needs before an emergency.

  • Scheduled visual and functional checks
  • Oil, coolant, fuel and battery review
  • Filter and consumable recommendations
  • Control-panel and alarm inspection
  • Service reporting
Compare maintenance plans

05 · Emergency generator repair

Send useful fault information from the start.

When a generator is unavailable, provide the equipment make and model, displayed alarm or fault code, location, fuel level, site-access instructions and clear photographs.

  • Urgent request routing
  • Fault-code and nameplate uploads
  • Site and access details
  • Contact-person information
  • Islandwide service requests
Open emergency request
Enclosed standby generator
Automatic transfer switch

06 · Automatic transfer switches

Move the load between utility and generator power.

An automatic transfer switch coordinates the change from the normal source to the standby source and back. Selection depends on current rating, poles, voltage, control logic and application.

  • New or replacement transfer equipment
  • Application and rating review
  • Controls and sequence coordination
  • Installation and testing support
Request transfer-switch assistance

07 · Switchgear installation

Protect, isolate and distribute power safely.

Switchgear and associated protection must be selected and integrated for the electrical system, operational requirements and applicable project standards.

  • Project requirement review
  • Equipment selection assistance
  • Installation coordination
  • Testing and documentation
Discuss switchgear needs
Electrical switchgear component
Generator controllers

08 · Generator control systems

Monitor, start, protect and communicate with the generating set.

Control upgrades or replacements may involve compatibility checks, sensor inputs, protection settings, transfer logic, remote signals and commissioning.

  • Controller identification
  • Replacement and upgrade enquiries
  • Battery chargers, relays and regulators
  • Fault display and nameplate review
Find a control component

09 · Fuel systems and tanks

Plan safe, practical fuel storage and delivery.

Fuel-system design and work should consider generator consumption, storage duration, tank type, transfer method, filtration, containment, access and applicable requirements.

  • Fuel-tank and accessory enquiries
  • Filtration and transfer components
  • Site assessment
  • Maintenance considerations
Request a fuel-system assessment
Fuel filtration component
Abstract power network

10 · Alternative and backup-energy solutions

Build resilience around essential loads.

Backup-power planning begins with the loads that must continue, the required duration, site constraints and the acceptable transfer or interruption time. Lestronics can help frame a practical project brief.

  • Essential-load prioritisation
  • Generator and transfer-system integration
  • Controls and monitoring considerations
  • Phased project planning
Start a power-security review

A clear process

From requirement to dependable operation.

01

Understand

Define the load, operating need, timing, site and budget priorities.

02

Assess

Review technical details, photos, drawings or the physical site.

03

Configure

Develop the equipment and service scope for quotation.

04

Deliver & support

Coordinate supply, installation, commissioning and after-sales care.

Power problem? Start here.

Let us help you build a dependable solution.